Factors such as sun exposure, shading from nearby structures or vegetation, roof angle.
Collaborate with the solar installer to design the system layout.
Research local regulations and obtain necessary permits for solar panel installation.
Regular cleaning, inspections, and maintenance are essential to ensure optimal energy production .
Have questions about solar panels, water pumps, or installations?
Renewable Energy Systems come in many shapes and sizes. Some are powered by solar panels; others by wind or water or a combination of these. Some are grid-connected; others are independent of utility power lines.
Which is right for you?
What is your primary reason for adding solar: saving money on electricity OR being independent of the utility company?
On-Grid systems are great for lowering your electrical bill, but require a connection to the utility company.
Off-grid systems allow you to live and work with electricity in areas where utility power is either unavailable or too expensive to bring in.
On-Grid systems with battery backup allow the best of both of the above, but are more expensive to start with.
Sunyukt Electrosolar includes packaged services throughout the entire solar power plant lifecycle from project development, design and engineering, project financing and investment, system components procurement, balance of system optimization and project construction management through operations and maintenance.
Commissioning is a way to formalize quality control of installed PV systems. The process ensures that systems are safe and performing as per their specifications. The commissioning process is typically applied to entire buildings. To set a framework for PV commissioning, it is useful to examine the total building commissioning process.